SCAD VSFX x Harbor NY (Week 8)

Tuesday 2/27 (Class 15)


Mentor Feedback:

  • Get more product logos visible in SH010
  • SH010 shadows need to be softer and longer (look at product photography references from previous weeks)
  • Add more bubble variation (size)
  • Double check size of hero product in SH050
  • Update filler cans in SH050
  • Diffuse shadow in ice box
  • Ice feels dirty (adjust white values)
  • Keep working on camera moves for transitions (make edits simpler, just cut transitions)
  • Lighting is too ambient
    • Get more shadows on Peeps
    • Top down lighting in SH040
  • Framing too tight in SH010
  • Umbrella doesn’t match (possibly remove)
  • Add condensation to cans in SH010
  • Fix DOF edges
  • Add more middleground items in SH020 for more depth
  • SH040 is too blue, water feels murky
  • Hold on lid close in SH050 & comp logo
  • Adjust frame so ice box handle is out of frame
  • Add peep pattern to background of live action plates
    • Leaving the background generic looks bad
  • Add more items in SH010
    • Empty peep box
    • Peeps on pool floats
  • Work on peep lighting & atmospheric perspective
  • Add more break up to the ground water
  • SH040 water color needs to match previous shots
  • Add subsurface scattering to peeps in SH040
  • SH050 should only have Peeps x Pepsi cans
    • Or keep the pool tube, remove the cans
  • Play with color in comp
    • Bring down the pink and blue to make the yellow stand out more
    • Use still from the Barbie Movie
  • Add gradient on ice box in SH020 (mimic sky)
    • Possibly use gobo
  • Make umbrellas white
  • Diving peeps in SH030 looks too flat
  • Check ray depth on bubbles

Professor Feedback:

  • Just get one frame looking good, then use that as reference for the rest of the shot
  • Have only 1 person work on a shot so it’s not overwhelming
  • At a minimum, get a still frame of our goal to show the mentors in person

Thursday 2/29 (Class 16)

This week our team downsized, which means we now have to learn a lot about compositing. Jerilyn and Tempest have been working on color grading and adding depth of field to our shots while i have been making last minute adjustments to lighting and shaders. My compositing assignment is to get our product logo onto the lid of the ice box in SH050.

Leave a comment